Home
\
Economy
\
Petrochemical complex in Garabogaz is ready to be put into operation
Economy
Petrochemical complex in Garabogaz is ready to be put into operation
Published 14.09.2018
1669

Preparation to the opening ceremony of ‘Garabogazcarbamid ‘ Plant, which was built in Garabogaz, Balkan Velayat, is carried out. New petrochemical complex provided with advanced technologies and equipment from the world manufacturers is designed for production of 1,155,000 tons of carbamide fertilizers per year. At present, the production of the main material- the first batches of liquefied ammonia has been started. Technology processes are automated and operated from centralized control centre. After commissioning of this industrial facility, which has no analogues in Central Asia, Turkmenistan will enter the rank of leading suppliers of large volumes of mineral production to the world market.

Last news
18.06
The official visit of the Prime Minister of Malaysia to Turkmenistan has begun
18.06
Decree of the President of Turkmenistan On Mashalov M.B.
18.06
The first meeting of the Turkmen-Slovak Joint Commission on Economic Cooperation took place in the Turkmen capital
17.06
Working trip of President Serdar Berdimuhamedov to Akhal velayat
17.06
The state concern «Türkmennebit» has been authorised to conclude an agreement to develop licensed blocks in the Turkmen sector of the Caspian sea
17.06
The President of Turkmenistan congratulated the President of the Republic of Iceland
16.06
An innovative path of development - a guarantee of prosperity of society and the state
15.06
President of Turkmenistan held an online working meeting
15.06
The President of Turkmenistan congratulated the Chairman of the People's Republic of China
15.06
The total amount of transactions at the SCRMET auctions exceeded 19 million 507 thousand USA dollars
top-arrow