Home
\
Politics
\
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Politics
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Published 24.05.2019
1371

The President of Turkmenistan signed the Resolution assigning the State Power Energy Corporation Türkmenenergo of the Ministry of Energy to sign the contract for provision of construction of the Energy Equipment Service and Maintenance Centre with external engineering communication on the territory Byuzmeyin State Power Station; the contract for provision of spare parts for gas turbine units with the Consortium of Çalik Enerji Sanayi ve Ticaret A.Ş (The Republic of Turkey) and Çalik Enerji Swiss AG (Swiss Confederation). The document assigns to start the construction in June 2019 and to compete the centre with full operational readiness by June 2022.

Last news
07.05
The President of Turkmenistan received the Minister of Economy and Sustainable Development of Georgia
07.05
The Capital Hosted a Meeting of the Intergovernmental Turkmen-Georgian Commission on Economic Cooperation
07.05
Celebrations in honour of the heroes of the Fatherland
06.05
The meeting of the State Security Council of Turkmenistan
06.05
Decree of the President of Turkmenistan on the appointment and dismissal of prosecutors from office
06.05
The President of Turkmenistan replaced the director of the TV and radio channel «Ýaşlyk»
06.05
In Honor of Victory Day
05.05
New Issue of the Electronic Journal «Arkadagly ýaşlar» Presented to Readers
05.05
289 pilgrims will travel to the Kingdom of Saudi Arabia to perform Hajj
04.05
President of Turkmenistan held an online working meeting
top-arrow