Home
\
Politics
\
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Politics
Equipment Service and Maintenance Centre to be built at Byuzmeyin Power Station
Published 24.05.2019
1301

The President of Turkmenistan signed the Resolution assigning the State Power Energy Corporation Türkmenenergo of the Ministry of Energy to sign the contract for provision of construction of the Energy Equipment Service and Maintenance Centre with external engineering communication on the territory Byuzmeyin State Power Station; the contract for provision of spare parts for gas turbine units with the Consortium of Çalik Enerji Sanayi ve Ticaret A.Ş (The Republic of Turkey) and Çalik Enerji Swiss AG (Swiss Confederation). The document assigns to start the construction in June 2019 and to compete the centre with full operational readiness by June 2022.

Last news
09.04
Meeting of Hero-Arkadag with the Head of the Turkmen-Austrian Society
08.04
The Latest Issue of «Arkadagly Ýaşlar» Magazine Has Been Published
08.04
President Serdar Berdimuhamedov took part in the solemn stone-laying ceremony of a new modern settlement
08.04
The visit of Hero-Arkadag to the Republic of Austria has begun
08.04
The President of Turkmenistan congratulated the elected President of the Socialist Republic of Vietnam
08.04
For the attention of the deputies of the Mejlis of Turkmenistan
07.04
President Serdar Berdimuhamedov took part in the mass bicycle race
07.04
Telephone Conversation between the Chairman of the Halk Maslahaty of Turkmenistan and the Chairperson of the Federation Council of the Federal Assembly of the Russian Federation
07.04
The President of Turkmenistan signed the Resolution
06.04
The President of Turkmenistan Held a Working Meeting via the Digital System
top-arrow