Home
\
Economy
\
Professionals for the New Combined Cycle Power Plant to be Trained in Accordance with Best Practices
Economy
Professionals for the New Combined Cycle Power Plant to be Trained in Accordance with Best Practices
Published 10.03.2017
2216

The Ministry of Energy of Turkmenistan developed the plan to train specialists, within the country and abroad, who will work at the 1574 MW combined cycle power plant that is being constructed at Mary Hydropower Plant, as well as to send them to Europe to study the best practices. This February the delegation from the Mary State Power Plant was on a business trip in France, Switzerland and Italy. The members of Turkmen delegation visited the gas turbine manufacturing plant, the training center, and were introduced to production technologies and specifics of turbine work. In addition, they visited the turbine blades manufacturing plant; the facility for production and maintenance of gas turbines and generator rotors; and the combined cycle power plant similar to the first ever Mary-3 power plant being built in Turkmenistan. The phased implementation of the special training program is also envisaged to train professionals for the new facility.

Last news
07.05
The President of Turkmenistan received the Minister of Economy and Sustainable Development of Georgia
07.05
The Capital Hosted a Meeting of the Intergovernmental Turkmen-Georgian Commission on Economic Cooperation
07.05
Celebrations in honour of the heroes of the Fatherland
06.05
The meeting of the State Security Council of Turkmenistan
06.05
Decree of the President of Turkmenistan on the appointment and dismissal of prosecutors from office
06.05
The President of Turkmenistan replaced the director of the TV and radio channel «Ýaşlyk»
06.05
In Honor of Victory Day
05.05
New Issue of the Electronic Journal «Arkadagly ýaşlar» Presented to Readers
05.05
289 pilgrims will travel to the Kingdom of Saudi Arabia to perform Hajj
04.05
President of Turkmenistan held an online working meeting
top-arrow