Home
\
Society
\
Municipal workers are preparing for the heating season
Society
Municipal workers are preparing for the heating season
Published 29.09.2017
2219

Public utility institutions of Turkmenistan conduct planned activities in preparation for the heating season 2017-2018. In order to ensure the uninterrupted functioning of heat supply systems in the winter season, major repairs of heating systems, preparation of specialized equipment were completed, dispatching services were equipped with the necessary equipment and transport. In order to increase the efficiency of municipal services, a consistent upgrade of the equipment of centralized heat supply systems is being carried out.

Last news
16.09
The President of Turkmenistan congratulated the President of the United Mexican States
15.09
The President of Turkmenistan met with the Prime Minister of the Republic of Korea
15.09
The President of Turkmenistan met with the Chairman of the National Assembly of the Republic of Korea
15.09
The President of Turkmenistan participated in the Turkmen-Korean Business Forum
14.09
The total amount of transactions at the SCRMET auctions amounted to more than 531 thousand USA dollars
14.09
State Visit of President Serdar Berdimuhamedov to the Republic of Korea Begins
12.09
The President of Turkmenistan congratulated the leadership of the Republic of Singapore
11.09
The President of Turkmenistan received the Minister of State for Economy, Trade, and Industry of Japan
11.09
The Ministry of Industry and Construction Production has been ordered to strengthen the material and technical base of its subordinate cement plants
11.09
The Regular Meeting of the CIS Economic Council Held in Ashgabat
top-arrow