Home
\
Economy
\
Petrochemical complex in Garabogaz is ready to be put into operation
Economy
Petrochemical complex in Garabogaz is ready to be put into operation
Published 14.09.2018
1579

Preparation to the opening ceremony of ‘Garabogazcarbamid ‘ Plant, which was built in Garabogaz, Balkan Velayat, is carried out. New petrochemical complex provided with advanced technologies and equipment from the world manufacturers is designed for production of 1,155,000 tons of carbamide fertilizers per year. At present, the production of the main material- the first batches of liquefied ammonia has been started. Technology processes are automated and operated from centralized control centre. After commissioning of this industrial facility, which has no analogues in Central Asia, Turkmenistan will enter the rank of leading suppliers of large volumes of mineral production to the world market.

Last news
05.05
New Issue of the Electronic Journal «Arkadagly ýaşlar» Presented to Readers
05.05
289 pilgrims will travel to the Kingdom of Saudi Arabia to perform Hajj
04.05
President of Turkmenistan held an online working meeting
04.05
On behalf of the President of Turkmenistan, war veterans will be presented with cash and valuable gifts
04.05
A State Commission for the organised conduct of the grain harvest in 2026 has been established
04.05
The total amount of transactions at the SCRMET auctions amounted to over 6 million 11 thousand USA dollars
03.05
Turkmenistan – TURKSOY: A Cultural Dialogue Bringing Brotherly Nations Closer
02.05
Concert Celebrates the 110th Anniversary of Veli Mukhatov
01.05
The meeting of the Cabinet of Ministers of Turkmenistan
01.05
The Ministry of education has been authorised to enter into contracts for the purchase of laptops produced in Turkmenistan
top-arrow